clinker plant renovation case

After years of operation, a 6,000t/d cement clinker production line in China was facing problems such as high energy consumption and low production efficiency. To improve production efficiency and reduce energy consumption, we implemented a series of transformation measures on the clinker plant. These included reducing preheater resistance, expanding the precalciner capacity, introducing staged combustion technology, and replacing the entire kiln system with a fourth-generation center-mounted roller crusher cooler. These improvements significantly improved all operating indicators of the clinker kiln system. In particular, the combination of staged combustion technology and the SNCR denitrification system has enabled NOx emissions to be controlled below 50 mg/Nm³, while significantly reducing the amount of ammonia used for denitrification, achieving the desired energy conservation and emission reduction results.

5 Problems before the transformation

  1. The preheater system faced significant resistance, resulting in a pressure of -6100Pa at the outlet of the C1 cyclone, which in turn increased the current of the high-temperature fan and the corresponding increase in the power consumption per ton of clinker. In addition, the tertiary air duct was arranged horizontally and was too long with many elbows, which easily caused dust accumulation in the duct.
  2. The volume of the precalciner was small, only 1465m³, which limited the residence time of the material in the decomposition furnace and made it difficult to achieve a decomposition rate of 85%. This not only increased the calcination load in the kiln, but also shortened the service life of the refractory bricks. At the same time, due to the volume of the decomposition furnace, it was impossible to implement the staged combustion denitrification transformation.
  3. The dust collection efficiency of the C1 cyclone dust collector was low, with elevated dust concentration at the outlet and an outlet temperature of about 330°C, which had an adverse impact on the firing heat consumption and kiln system output.
  4. The company strictly followed the local government’s ultra-low emission standards and optimized the SNCR denitrification system many times. However, as the ammonia consumption approaches the design peak, the problem of poor ammonia atomization gradually emerges, posing a safety hazard of flash explosion. At the same time, controlling the production line’s NOx emissions below 100 mg/Nm³ required dosing a 20% ammonia solution, which put significant pressure on operating costs.
  5. The clinker temperature out of the clinker cooler exceeds 150℃, while the heat recovery efficiency of the cooler is low. As the equipment is used for a longer time, the failure rate of the cooler gradually increases, which not only increases production and maintenance costs but also leads to increased power consumption.

To achieve energy conservation and consumption reduction in the kiln system and ultra-low nitrogen oxide emissions, our company carried out a comprehensive upgrade and renovation of this 6,000 t/d cement clinker production line during a staggered outage in December 2020. Following the renovation, all parameters of the firing system have significantly improved, achieving the desired results.

Renovation plan for the clinker production line

1. Preheater Resistance Reduction Retrofit

To reduce resistance and power consumption in the kiln tail system, we performed technical upgrades on each stage of the preheater cyclones. This upgrade focused on expanding the cyclone inlet area and modifying the volutes and connecting ducts. The C1 cyclone, the final stage of the kiln tail flue gas flow, was upgraded to improve material separation efficiency, thereby reducing dust concentration in the preheater flue gas and heat carried away by the kiln tail flue gas, while also reducing cyclone resistance.

The original C1 cyclone did not provide sufficient separation capacity, so it was replaced during this upgrade. This upgrade aims to improve dust collection efficiency, reduce system resistance, and lay the foundation for achieving ultra-low NOx emissions. The height of the new cyclones was also increased by 10 meters to 25 meters.

In addition, we also modified the cyclones from C2 to C5. This upgrade included expanding the inlet area, lengthening the straight section of the volute, and adjusting the inner tube height accordingly. At the same time, we also made appropriate adjustments to the air duct connections based on the modifications to the cyclone’s air inlet. It’s particularly noteworthy that after the C5 cyclone’s volute was modified, the volute needed to be rotated to connect to the extension duct of the calciner. These modifications have laid a solid foundation for improving the kiln system’s overall performance and reducing energy consumption.

preheater renovation

Before the renovation, the tertiary air duct had a diameter of 5 meters. Due to the low tertiary air velocity, this caused severe dust accumulation. To address this issue, we replaced the entire tertiary air duct with a 3-meter diameter pipe, thereby increasing the tertiary air velocity. Furthermore, to further optimize system performance, we adopted a single-inlet connection between the tertiary air duct and the precalciner column and added a 4-meter denitrification air duct. A comparison of the tertiary air duct before and after the renovation is shown in Figure 2.

Comparison before and after the renovation of the tertiary air ducts

2. Precalciner Expansion and Renovation

As the core of the precalciner system, the performance of the precalciner has a crucial impact on the overall technical specifications of the system. Within the precalciner, pulverized coal combustion is the primary reaction, while raw meal decomposition is the ultimate goal. The size of the furnace directly determines the intensity of the pulverized coal combustion reaction. To further improve system performance, we developed a precalciner expansion and renovation plan: the existing pre-combustion furnace (SC) was removed, while the existing MC furnace was retained and raised to form part of the expanded precalciner. A new gooseneck was added. This gooseneck exited from the top of the precalciner, curved downward on either side through extension pipes, and ultimately connected to the C5 cyclone. After the renovation, the total volume of the precalciner and gooseneck expanded to 3200m³, better meeting the physical and chemical reaction requirements of the precalciner system for gas-fuel heat exchange, CaCO3 decomposition, and pulverized coal combustion. A comparison of the pre- and post-renovation performance is shown in Figure 3.

Precalciner Expansion and Renovation

3. Staged Combustion Modification

By raising the tertiary air duct to a higher position within the precalciner, we significantly expanded the volume of the precalciner’s reduction zone. This modification not only prolonged the NOx reduction time but also significantly improved reduction efficiency. This innovative measure effectively reduced both thermal NOx generated by the rotary kiln and fuel NOx generated by the precalciner modification, significantly reducing NOx concentrations within the firing system. Compared to traditional denitrification technologies, the staged combustion denitrification system doubles the gas residence time in the reduction zone. Its ample furnace capacity and gas residence time ensure both source reduction of NOx emissions and complete fuel combustion, achieving both energy-saving and environmentally friendly performance for the precalciner.

4. Kiln Tail Smoke Chamber and Sealing Renovation

The kiln tail smoke chamber serves as the connecting hub for materials entering the kiln and for gases exiting the kiln. Its design must ensure smooth material entry and minimize dust generation. Furthermore, the pressure drop caused by the exhaust gases passing through the smoke chamber must be minimized. Following the production increase, we replaced the system smoke chamber with the latest design. The diameter of the smoke chamber’s constriction was increased, and the connection between the smoke chamber and the rotary kiln was optimized. This significantly reduced pressure drop and improved kiln ventilation. Furthermore, we replaced the kiln tail seal and increased the clearance between the sloped section and the vault, further reducing system resistance and improving kiln ventilation. The wrap angle of the smoke chamber’s “feed tongue” was increased to 180°, and its length was appropriately lengthened to minimize leakage at the seal. The kiln-tail throat was enlarged to increase the effective flow area and reduce ventilation resistance, creating the conditions for further optimization of the kiln-tail smoke chamber.

5. Renovation of the precision ammonia injection system

In order to further reduce the system’s nitrogen oxide emissions, the existing SNCR system needs to be upgraded. By setting different spray gun groups at different positions at the kiln tail and adjusting the spray gun positions according to different working conditions, the uniform distribution of ammonia in the reaction zone can be achieved, thereby greatly improving the utilization rate of ammonia water. The key contents of the SNCR system ammonia injection optimization include:

(1) Optimization of the SNCR spray gun and injection point position

The original SNCR system ammonia injection position is mainly located above the middle neck of the decomposition furnace and the straight tube of the C5 cyclone. During the technical transformation process, in order to ensure the denitrification effect, we consider setting up 16 spray guns and using a multi-point injection method to improve the denitrification efficiency of the SNCR system. The spray-gun positions were selected from 20 candidate locations to achieve good atomization and dispersion. After debugging, except for the 4 spray guns at the outlets of C5-1 and C5-2 that are not used, the remaining spray guns have been put into use.

(2) Optimization of ammonia spray flow control system

Based on the original SNCR system, we added independent flow meters and regulating valves to each group of spray guns, so that we can clearly grasp the spray status and actual ammonia flow of each spray gun, and thus more effectively adjust the ammonia dosage.

(3) Optimization of spray gun type

We carefully selected the appropriate spray gun type according to different flue gas characteristics and injection positions. In areas with faster flue gas flow rates, we selected cone-shaped spray guns with strong penetration; and in areas with slower flue gas flow rates, we selected fan-shaped spray guns with wider coverage. This optimization effectively increases the contact opportunities between ammonia and nitrogen oxides in the SNCR system, thereby improving the denitrification efficiency.

(4) Addition of ammonia spray detection and control system

Based on the original ammonia spray system, we added a set of accurate ammonia spray detection and control systems. This system can monitor the NOx content of various parts of the SNCR system online in real time, and intelligently adjust the ammonia spray position and ammonia dosage based on the monitoring results to achieve accurate ammonia spray.

After optimizing staged combustion, the NOx concentration before ammonia injection dropped from 670 mg/Nm³ to approximately 300 mg/Nm³. When the denitrification system’s nitrogen oxide emissions are controlled at 40-50 mg/Nm³, the consumption of 20% ammonia solution is approximately 6 kg/t.Cl. This series of improvements not only significantly reduced nitrogen oxide emissions but also increased ammonia utilization efficiency.

6. Cooler Renovation

We fully upgraded our existing push-rod cooler to a fourth-generation cooler with a central roller crusher. The new cooler’s effective cooling area is 5% larger than the previous model. The new equipment utilizes a step-by-step mechanism for horizontally movable grates and material conveying, significantly improving conveying efficiency. Furthermore, it features a standardized modular design, labyrinth seals, and Coanda-effect optimized grates. These improvements not only reduce installation time and improve maintenance efficiency, but also lower maintenance costs and the difficulty of sourcing spare parts. These improvements have collectively contributed to overall improvements in the efficiency and environmental performance of the cement production line.

7. Electrical Automation Renovation

This production line uses the existing distribution station power supply as its power source, with the low-voltage side automatically compensated by a low-voltage capacitor compensation cabinet. A new medium-voltage motor was added, fully utilizing the existing medium-voltage distribution station’s capacitor compensation. Regarding motor selection, wound-rotor motors or squirrel-cage motors were selected based on starting conditions. Squirrel-cage motors utilize direct full-voltage starting, while speed-regulating motors utilize variable-frequency speed regulation. For motors 280kW or greater, 6kV high-voltage motors were used; for motors less than 280kW, 380V low-voltage motors were used. Low-voltage motors 132kW and above are equipped with electronic soft starters.

The electrical automation system renovation ensures optimal production line operation, ensuring product quality, saving energy, and improving productivity. The firing system utilizes advanced and stable technology, achieving both centralized management and decentralized control through a distributed computer control system. Building on the existing DCS system, we upgraded the software for the centralized control of the production line equipment while retaining the existing engineering station, operator station, and server.

Retrofit Results

Since the cement clinker production line was completed and put into operation in March 2021, after more than a year of actual operation, we have observed a significant reduction in smoke chamber crusting and a significant reduction in resistance in the preheater system. Furthermore, all operating indicators of the kiln system have significantly improved, with lower specific electricity consumption and standard-coal consumption after the retrofit. Furthermore, by combining staged combustion with a SNCR denitrification system, the kiln system has reported NOx emissions of 40–50 mg/Nm³ with approximately 6 kg of 20% ammonia solution per tonne of clinker, meeting the stringent national and local requirements for ultra-low NOx emissions. This kiln system retrofit not only successfully achieved the intended goals of energy conservation and consumption reduction, as well as ultra-low NOx emissions, but also achieved significant economic and social benefits.